Home › Services › Flooring in Mijas

Flooring specialists · Mijas & Costa del Sol

Flooring in Mijas — laid level, sealed and guaranteed

Porcelain, wood, vinyl and microcement fitted across Mijas and La Cala. Most homes here are over a slab that is never quite flat — levelling it properly is what separates a floor that lasts from one that lifts in two years.

Levelling includedSkirting and trimsFree home visit
Suelo nuevo instalado en una vivienda de Mijas
3–7Days for a full floor
200+

Renovations delivered on the Costa del Sol

3–7

Days for a typical apartment floor

0€

Home visit and written quote

1

Project manager from quote to handover

What's includedQué incluye

The part nobody sees is the part that matters

Anyone can lay a plank. What makes a floor last on the Costa del Sol is the preparation underneath: levelling, moisture, expansion gaps and the transitions between rooms.

  • Lifting the old floor. Removal of the existing tiles or flooring and clean disposal of the debris.
  • Levelling the slab. Self-levelling compound where needed, so there are no hollow spots or rocking tiles later.
  • Moisture barrier. Essential in ground-floor and beachside properties, where damp comes up through the slab.
  • Laying and cutting. Precision cuts around doors, columns and curves — not a strip of trim hiding a bad edge.
  • Skirting and transitions. New skirting, door bars and level changes finished to match the floor.
  • Sealing and handover. Grouting, sealing where the material needs it, and a full clean before you walk on it.

Our workNuestros trabajos

Floors we have fitted in Mijas and La Cala

Suelo porcelánico en Mijas
Large-format porcelain
Suelo de madera en La Cala de Mijas
Engineered wood, La Cala
Suelo nuevo en apartamento de Mijas
Apartment refit, Mijas
Suelo radiante bajo el pavimento
Underfloor heating below

Cost

What decides the price of your floors

Every property here is different, and a number given over the phone is a guess — guesses are what turn into extras later. We visit, measure and give you an itemised written price at no cost. These are the things that move it.

Square metres

The single biggest factor, and the easiest one for you to measure before we come.

Material

Porcelain, engineered wood, vinyl and microcement sit at very different price points.

State of the slab

How much levelling compound it needs, and whether there is damp to deal with first.

Skirting and transitions

New skirting, door bars and level changes between rooms all add labour.

How it works

Four steps, no surprises

STEP 01

Tell us what you need

A call, a WhatsApp or the form below. Photos of the space help, but they are not essential.

STEP 02

Free visit and measurements

We come to the property, measure up and talk through what is realistic and what it will involve.

STEP 03

Written fixed price

An itemised quote with materials, labour and dates. It does not move unless you change the scope. Licence fees and taxes are not included.

STEP 04

We fit and hand over

One project manager coordinates every trade, keeps you updated and hands the property back clean.

Options

Materials we fit

Porcelain

The default on the coast: hard, cool in summer and indifferent to sunlight.

Engineered wood

Real wood surface over a stable core, so it copes with the humidity here.

Luxury vinyl

Waterproof and quiet. The usual choice for holiday rentals and bathrooms.

Microcement

Seamless and modern, laid over the existing floor with no demolition.

Outdoor porcelain

Non-slip and frost-proof for terraces, pool surrounds and stairs.

Underfloor heating

Electric or water systems installed under the new floor while it is open.

Where we work

Flooring by area

Our crews work between Marbella and Fuengirola every day, so a site visit is usually the same week.

Common questions

Flooring FAQ

Can you lay a new floor over the old one?
Sometimes. Microcement and some vinyls can go over sound existing tiles, which saves demolition and days of dust. But if the old floor is hollow, cracked or uneven, covering it just moves the problem up a layer. We tell you which case you are in at the visit.
How long will I be out of the rooms?
A typical apartment takes three to seven days including levelling and drying time. Microcement needs longer because of the curing between coats.
Do you move the furniture?
Yes, within the property. We protect what stays and sheet off the rooms that are not being touched so the dust does not travel.
What about damp coming up through the slab?
Very common in ground-floor and beachside properties. We check it before quoting and include a moisture barrier where it is needed — laying wood over a damp slab is how floors end up cupping.
Who arranges the licence and community permission?
You do. Applying to the town hall and getting permission from your community administrator are the owner’s responsibility, and licence fees and taxes are not included in our quotes. We give you the technical documentation you need in order to apply.
Can you manage the job if I live abroad?
Most of our clients are not in Spain while the work happens. We send photo updates at each stage, decide against the agreed spec and hand over with a video walkthrough.
How do payments work?
Staged against work completed, never the whole amount up front. The schedule is in the contract before anything starts and every payment is invoiced with IVA.

Free quote

Tell us about your floors

Give us the rough square metres and the rooms, and we will come back with materials and a price.

Ready when you are

Get a price for your floors this week

We visit, measure and put it in writing. Homefixing · La Cala de Mijas · info@homefixing.es